No.
|
Customer
Name
|
Owner/End
User
|
Description
|
Q’ty
|
1
|
PT. SB-Con
Pratama
|
PT. SB-Con
Pratama
|
Instalasi Pipa
Steam Dari Boiler ke Autoclave
|
1 Lot
|
2
|
PT. SB-Con
Pratama
|
PT. SB-Con
Pratama
|
Isolasi Pipa
Steam Dari Boiler ke Autoclave
|
1 Lot
|
3
|
PT. COSL Indo
|
PT. COSL Indo
|
Repair Motor
untuk Drilling Equipment
|
1 Ea
|
4
|
PT. Sinar
Mutiara Indah
|
PT. Sadikun
Niagamas Raya
|
Instalasi
Pipeline Gas Alam 12” di Gresik
|
5,4 Km
|
5
|
PT. Sinar
Mutiara Indah
|
PT. Sadikun
Niagamas Raya
|
Bending Pipe 12”
& Galian Tie-in Pipeline
|
1 Lot
|
6
|
PT. Sinar
Mutiara Indah
|
PT. Sadikun
Niagamas Raya
|
Jembatan Untuk
Pipeline 12” (12, 14 & 6 mtr)
|
3 Ea
|
7
|
PT. Sinar
Mutiara Indah
|
PT. Sadikun
Niagamas Raya
|
Boring 16”
& Galian Tie-in Pipeline
|
1 Lot
|
8
|
PT. Sinar
Mutiara Indah
|
PT. Sadikun
Niagamas Raya
|
Galian/Pit
Crossing, Singker & Insert Pipe Lot-1
|
1 Lot
|
9
|
PT. Sinar
Mutiara Indah
|
PT. Sadikun
Niagamas Raya
|
Galian/Pit
Crossing, Singker & Insert Pipe Lot-2
|
1 Lot
|
10
|
PT. Sinar
Mutiara Indah
|
PT. Sadikun
Niagamas Raya
|
Galian
Crossing, Singker & Insert Pipe Lot-3 & Venting
|
1 Lot
|
11
|
Camar Resources
Canada, Inc.
|
Camar Resources
Canada, Inc.
|
Repair Vecto
Grey Xmas Tree 3.1/8” x 5000 Psi MAWP
|
1 Unit
|
12
|
Camar Resources
Canada, Inc.
|
Camar Resources
Canada, Inc.
|
Instalasi Riser
Pipe Dia. 8” Sch.80 di Platform (Offshore)
|
1 Lot
|
13
|
Camar Resources
Canada, Inc.
|
Camar Resources
Canada, Inc.
|
Repair Swivel
Pipe Pipe Dia.6” #300 x #150
|
1 Unit
|
14
|
PT. Djabes
Sejati
|
PT. Djabes
Sejati
|
Erection Steel
Platform & Support
|
1 Lot
|
15
|
PT. Djabes
Sejati
|
PT. Djabes
Sejati
|
Instalasi
Compressed Air Piping & Pipe Support
|
1 Lot
|
16
|
PT. Sinar
Mutiara Indah
|
PT. Sadikun
Niagamas Raya
|
Instalasi
Pipeline Gas Alam 6” di Gresik
|
4,3 Km
|
17
|
PT. Barata
Indonesia
|
PT. IKPT /
PKT-5
|
Fabrikasi
Pressure Vessel (PV) : ME Separator (2700 ID x 2950 TL/TL x 42 mm); ALD Drum
(1800 ID x 6500 TL/TL x 40 mm); Refrigerant Receiver (2000 ID x 7000 TL/TL x
20 mm)
|
3 Unit
|
18
|
PT. Intermedia
Energy
|
PT. Intermedia
Energy
|
Pembuatan PV :
Inlet Separator & Flare KO Drum
|
2 Unit
|
19
|
PT. Tanker
Samudera Mandiri
|
PT. Pertamina
Shipping
|
Desain &
Instalasi Flowmeter/Metering 6 “x#150 di Tanker MT. Nirbaya
|
1 Unit
|
20
|
PT. Barata
Indonesia
|
PT. Semen
Padang
|
Fabrikasi Mill Body
& Classifier Base untuk Cement Plant
|
2 Unit
|
21
|
Camar Resources
Canada, Inc.
|
Camar Resources
Canada, Inc.
|
Survey &
Inspection Wall-thickness Flowline Piping of Production Platform facilities.
|
3 Unit
|
22
|
PT. Tanker
Samudera Mandiri
|
PT. Pertamina
Shipping
|
Instalasi
Flowmeter/Metering 6 “x#150
|
1 Unit
|
23
|
PT. Apexindo
Duta Pratama
|
PT. Apexindo
Duta Pratama
|
Perform
Measuring & Checking for Straightness of Cantilever Skid Beam of Raissa
Rig
|
1 Unit
|
24
|
K3PG
|
PT. Petrokimia
Gresik
|
Supply of Low
Temp Flange
|
2 Unit
|
25
|
K3PG
|
PT. Petrokimia
Gresik
|
Supply of
Control Valve Dia. 4” #600
|
1 Unit
|
26
|
K3PG
|
PT. Petrokimia
Gresik
|
Supply of Ball
Valve Dia. 6” #300
|
10 Ea
|
27
|
K3PG
|
PT. Petrokimia
Gresik
|
Supply of ROHM
Lathe Machine Chucks
|
2 Unit
|
28
|
PT. Petrokimia
Gresik
|
PT. Petrokimia
Gresik
|
Desain &
Fabrikasi Economizer Steam Boiler
|
1 Unit
|
29
|
PT. Tonasa
Lines
|
PT. Tonasa
Lines
|
Turnkey : Engineering,
Design, Fabrication & Installation (Include PLC) of Pneumatic Cement
Discharge By Blowtank System for Cement Vessel TONASA LINE VI
|
1 Unit
|